Everything for your
feeding system.
Shop run videos, equipment manuals, and project documents — together in one place for your team.
- Customer
- Vector Technologies
- Part name
- Plastic Tube / Overnut
Watch your system run
See how we ran your job in our shop. Use the video as a visual reference for part flow, orientation, and system operation.
Press play below to watch the shop run. Use the player controls for sound and fullscreen.
FC-25-22182 — Plastic Tube setup sequence and operating settings
Setup sequence, operating settings, and illustrated reference instructions are included in this PDF.
Shop setup settings
Recorded reference values from the shop run. Settings may require adjustment for operating conditions.
Taller Grey Parts
| Equipment | Speed / amplitude | Frequency |
|---|---|---|
| Bowl | 21.0 | 60 Hz |
| Hopper | 18 | 60 Hz |
| Inline | 25 | 60 Hz |
Shorter Blue Parts
| Equipment | Speed / amplitude | Frequency |
|---|---|---|
| Bowl | 21 | 60 Hz |
| Hopper | 18 | 60 Hz |
| Inline | 25 | 60 Hz |
60psi for Taller Part 63psi for Shorter Part
Testing notes
Limited parts were available for shop testing. The hopper could not be filled to its normal operating level. Recorded speed/amplitude percentages may need to be increased or decreased under a full load because the additional part weight can affect feeding performance.
Settings shown were recorded with the supplied sample parts. Changes in part dimensions, material, surface condition, or lot may require setup adjustments.
Final setup should be checked under the customer’s normal operating conditions, including typical hopper fill level and downstream demand.
Manuals & project files
Documents open in a new tab.
System documentation
7 documentsThese resources are intended to support the part handling system for job FC-25-22182. Follow the applicable equipment manuals and your facility’s operating procedures.